The following is as built drawings of environmentally sound concrete motorcycle wash bay with oil/water separator installed at the Mindola Dam motocross circuit and are for information only. The use of all or any part of these details is entirely at the own risk of any person or entity choosing to do so and it would be incumbent upon such person or entity to seek professional advice to ensure that all local laws, bylaws, safety requirements or any statutory requirement is complied with. The copyright in these drawings vests in the designer and furthermore the uploader of these details accepts no liability whatsoever for any use of the drawings or details from whatsoever cause arising.
Should one wish to accommodate more motorcycles on the wash bay, the length of the concrete wash pad can be lengthened from 12 metres to whatever is required. The first drawing is for the civil construction and the second drawing is for a centrally placed work height water manifold with 20 by ¾“ ball valves with ½” quick connectors to connect high pressure washers to. (Estimate 100 liters + per minute supply needed for 20 high pressure washers to operate) Manifold stands in the middle of the concrete wash pad directly above the central drain. The high pressure washers can potentially be placed on the grating above the manifold.
FIM AFRICA MOTOCROSS WASH BAY AND OIL SEPARATOR
DRAWING + FIM AFRICA MOTOCROSS WASH BAY WATER MANIFOLD
MOTOCROSS CIRCUIT ABLUTION FACILITY:
The following is as built drawings of motocross circuit ablution facility installed at the Mindola Dam motocross circuit and are for information only. The use of all or any part of these details is entirely at the own risk of any person or entity choosing to do so and it would be incumbent upon such person or entity to seek professional advice to ensure that all local laws, bylaws, safety requirements or any statutory requirement is complied with. The copyright in these drawings vests in the designer and furthermore the uploader of these details accepts no liability whatsoever for any use of the drawings or details from whatsoever cause arising.
FIM AFRICA ABLUTION BLOCK DRAWING + FIM AFRICA ABLUTION BLOCK PLANS AND SCHEDULES
MOTOCROSS SEMI PORTABLE SKID MOUNTED GRAND STANDS:
The following is as built drawings of semi portable skid mounted grand stands installed at the Mindola Dam motocross circuit and are for information only. The use of all or any part of these details is entirely at the own risk of any person or entity choosing to do so and it would be incumbent upon such person or entity to seek professional advice to ensure that all local laws, bylaws, safety requirements or any statutory requirement is complied with. The copyright in these drawings vests in the designer and furthermore the uploader of these details accepts no liability whatsoever for any use of the drawings or details from whatsoever cause arising.
MOTOCROSS CIRCUIT FOOD AND BEVERAGE HALL: